The project delivered a complete IT and communication infrastructure upgrade across two campuses — 𝗔𝗹...
The project delivered a complete IT and communication infrastructure upgrade across two campuses — 𝗔𝗹 𝗪𝗲𝗵𝗱𝗮 𝗦𝗰𝗵𝗼𝗼𝗹 𝗮𝗻𝗱 𝗦𝗲𝗲𝗿 𝗕𝗮𝗻𝗶 𝗬𝗮𝘀 𝗦𝗰𝗵𝗼𝗼𝗹. Scope of work included:
• 𝗦𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗲𝗱 𝗖𝗮𝗯𝗹𝗶𝗻𝗴:Installation of 800 data points to ensure strong connectivity.
• 𝗪𝗶𝗿𝗲𝗹𝗲𝘀𝘀 𝗡𝗲𝘁𝘄𝗼𝗿𝗸: Deployment of 352 access points for reliable Wi-Fi coverage.
• 𝗪𝗶𝗿𝗲𝗱 𝗡𝗲𝘁𝘄𝗼𝗿𝗸: Installation of 74 switches, 8 IDFs, and 2 MDFs.
• 𝗖𝗼𝗺𝗺𝘂𝗻𝗶𝗰𝗮𝘁𝗶𝗼𝗻 𝗦𝘆𝘀𝘁𝗲𝗺𝘀: Setup of 42 IP phones, 2 voice gateways, and related infrastructure.
• 𝗡𝗲𝘁𝘄𝗼𝗿𝗸 𝗦𝗲𝗰𝘂𝗿𝗶𝘁𝘆: Implementation of 2 firewalls to protect school networks.
𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝗦𝗶𝘇𝗲:
• 74 Switches
• 352 Access Points (AP)
• 8 Intermediate Distribution Frames (IDF) / 2 Main Distribution Frames (MDF)
• 800 Data Points
• 42 IP Phones
• 2 Voice Gateways
• 2 Firewalls
Detailed specifications and project deliverables
Aldar Education
Abu Dhabi, UAE
completed
3-6 months
Advanced technology stack implemented in this project
High-performance networking equipment and structured cabling systems for reliable connectivity.
Advanced security monitoring and access control systems for comprehensive protection.
Interactive displays and audiovisual systems for enhanced communication and collaboration.
Measurable outcomes and client satisfaction metrics
Let's discuss how we can implement similar technology solutions for your organization. Our experienced team is ready to help you achieve your goals.